Project Type Water
Project Status Design
Project Area Saanich
Estimated Cost $400,000
Estimated Start Date 01-Oct-2020
Estimated End Date 31-Mar-2021
Estimated Duration 4 weeks (construction)
Contracted To / Performed By TBD

Description

Standby generation is being installed at Hamsterly Pump Station to ensure adequate flow is maintained to meet maximum demand for the next 20 years.

Receive email updates for Hamsterly Pump Station Backup Power Generator

Subscribe

Contact Us

David Scharbach - Project Engineer 
Infrastructure Engineering, Integrated Water Services
T: 250.474.9519