Addendum No3 posted, November 21, 2022
Addendum No2 posted, November 4, 2022
Addendum No1 posted, November 3, 2022
Invitation to Tender
SSI 2022-017 Weston Creek at Morningside Road Water Main Renewal
The works and requirements under this Contract generally include, but are not limited to, the following:
- The construction of approximately 33.5m of new 150mm diameter water main including all fixtures and fittings as shown on the issued for tender drawings,
- The restoration of all disturbed surfaces.
- All traffic management including but not limited to; drafting and submitting and ongoing management of site specific traffic management plan(s) (one lane to remain open at all times).
- All required erosion and sediment control management including but not limited to a site specific erosion and sediment control plan and ongoing management of the plan.
- All work to be undertaken with reference to the CRD Archaeological Chance Find Management Plan.
- All Health and Safety requirements.
Closing Date: Tuesday, November 29, 2022, 2:00pm
Inquiries to:
Doug Weihing
Telephone: 250 538 4312
Email: dweihing@crd.bc.ca