SSI 2022-002
Analysis, Strategy, Works Program and Detailed Design – AC Pipeline Replacement – Fulford Water
The general scope is for the development of a strategy and phased program to replace aging Asbestos Cement (AC) watermains in the Fulford water system and perform detailed design for the watermain renewals. A strategic analysis of the Fulford water system is required to provide a hierarchy of risk and criticality of the existing AC pipelines. Working with the results of this assessment create a program of renewal for the replacement of the existing asbestos cement water pipelines. The scope will include new water meters for each property as well as new service connections.
Closing Date: Thursday, November 10th 2022 2:00pm