Aquatic Complex Expansion/Renovation Project

The renovated and expanded aquatic complex at Panorama had its grand opening on October 24, 2009. The project was first conceptualized in the Commission’s 1999 Spatial Analysis and refined through the design development process once the design and construction consultants came on board.

Construction started on March 10, 2008 and included the complete removal of the original 1977 building, with the pool tank being kept and incorporated back into the new space. Design, budget and the final report from the Construction Manager are available through the links on the right.

 

Project Report, Design, Budget & Schedule