A roadside swale was built in the winter of 2007-08 as a retrofit and covers a 120 metre distance on a public right of way.

Rainwater Management Techniques Used

roadside-swale 220x136 hhBioswales

While original plans called for a 60 metre rain garden as well as a bioswale, budget constraints meant only the swale could be built at the time. The swale takes runoff from the Island Highway surface, providing some slowing and treatment of water quality. The grasses swale is an alternative to a standard enclosed pipe approach. Phase II of this project will include a rain garden component with underdrains.

Cost & Funding

$40,000, with public funding.

Project Team

Swell Environmental Consulting, Biologist
Kerr Wood Leidal Associates Ltd, Civil Engineer

Location

Island Highway between Kisliingbury Lane & Burnett