Project manager:
Steve Curnow, Manager, Watershed
|
Contact person:
Alex Zayonc, Purchaser
|
Project manager phone:
(250) 391-3562
|
Contact person phone:
(250) 474-9674
|
|
PublishedDate:
Jun 11, 2019, 08:20 AM
|
ClosingDate:
Jun 26, 2019, 03:00 PM
|
|
Departments:
Integrated Water Services
|
Project Status:
Concluded
|
Tender Type:
Invitation to Tender
|
|
Awarded to:
Pacific Industrial Marine Ltd.
June 21, 2019: Addendum No 1. Non Mandatory Site meeting minutes and Proponent Q&A.
June 11, 2019:
1.
INVITATION TO TENDER
1.1
Sealed Tenders, plainly marked on the envelope Tender for Contract
Number 2019-501 SUPPLY AND INSTALLATION
OF L504 BRIDGE" will be received by the Purchaser, Integrated Water
Services of the Capital Regional District at their offices at 479 Island
Highway, Victoria, British Columbia up to
3:00 pm local time on June 26, 2019,
at which time they will be opened in public.
1.2
The works to be constructed under this Contract include, but are not
limited to:
-
Removal of existing culvert L142 (2200
mm x 12 m) on Leech River
-
The supply, delivery, and installation
of a new 15.0 m x 6.0 meter concrete bridge with concrete slab or inverted channel
girders in the Leech Water Supply Area
-
Removal of two overflow culverts and
replacement of one overflow culvert
(1000 mm x 13 m)
1.3
Digital copies of Specifications, Drawings, Contract Documents, and
Tender Form will be available for no cost electronic download from the CRD
website at https://www.crd.bc.ca/about/contracts-rfps/current after registering
as a vendor. Registration is done on the
website at no cost.
1.4
The lowest or any tender will not necessarily be accepted.
1.5
A non-mandatory pre-tender site meeting to review the site conditions,
laydown areas, and access route will be held at 9:00 am on Tuesday,
June 18, 2019 commencing at the Watershed Protection Field Office, 3051 Niagara
Main Road in Langford.
For information
and/or enquiries on this project please contact Alexandria Zayonc, Purchaser at
250-474-9674