Water Projects
Sound engineering design determines the overall layout and components for a drinking water system and impacts both the ease of operation and the quality of water within the system. The Infrastructure Engineering Division provides engineering services for the bulk supply system, the Juan de Fuca Water Distribution System and the Saanich Peninsula Water Supply System. The links below provide information on current and historical water projects.
Current Regional Water Supply Projects
Current Saanich Peninsula Water System Projects
Current Juan de Fuca Water Distribution Projects
- Olympic View Drive Water Main Upgrade new
- Arngask Pressure Control Station Installation
- Saddleback Road and Hackamore Drive Water Main Upgrade
- Glen Forest Way and Sundance Drive Water Main Upgrade
- Chalister Court Water Main Upgrade
Past Water Projects
- Mount View Avenue and Carol Ann Place Water Main Upgrade
- Hansen Avenue, Bellamy Road and Phelps Avenue Water Main Upgrade
- Latoria Road Water Main Upgrade
- Golledge Avenue Water Main Upgrade
- Maple Avenue Water Main Upgrade
- Main No.2 Replacement
- Glen Lake Road Water Main Replacement - Phase 2
- Island Highway Water Main Connection
- Wentwich Road Water Main Replacement
- Jacklin Road Water Main Upgrade
- Duke Road Water Main Replacement
- French Road South Water Main Upgrade
- Main No.14 Extension
- Sooke Reservoir Expansion
- Main No.1 Replacement
- Fulton Reservoir
- Supply Pipeline to Sooke
- Sooke River Road Disinfection Facility
- Island Hwy Water Main Replacement – Phase 2