Welcome to Lyall Harbour/Boot Cove Drinking Water

The Lyall Harbour / Boot Cove Water System provides drinking water to a small Water Service Area on Saturna Island. CRD Integrated Water Services is responsible for the overall operation of the water system with day-to-day operation being provided by the CRD Water Management Division. The design and construction of water system facilities is overseen by the CRD Integrated Engineering Division. The quality of drinking water provided to customers in the Lyall Harbour / Boot Cove Water System is overseen by the CRD Water Quality Division.

Drinking Water News

 

Water System Improvements Underway (Status as of April 25, 2012)

Upgrades to the Lyall Harbour/Boot Cove Water System are underway with completion anticipated in the spring 2012. Two projects are running concurrently:

 

Balancing Reservoir (construction started in December, 2011).

The supply and construction of a 30,000 imperial gallon bolted steel balancing reservoir located adjacent to the existing fire storage tank on the hill above the Saturna Recreation Centre was awarded to Stone Pacific Contracting Ltd in October 2011, in the amount of $288,495. This reservoir will even out (balance) the high and low flows in the water system enabling a more consistent flow through the treatment plant and improved quality of water at the tap. The tank has now been constructed at the site and is currently being tested and disinfected to enable it to be put in service in May 2012.

 

Water Treatment (construction started in December, 2011)

The water treatment process upgrade works were awarded in October 2011, to Pye Construction Ltd in the amount of $458,875. These works will provide improvements to the treatment process including improved disinfection, replacement of filter media, reduction of the treatment process flow rate, capture of the seepage water below Money Lake #1 dam and re-plumbing of the existing treatment building at Narvaez Bay/Harris Road. Construction started in December 2011, with work below Money Lake #1 dam and at the Walter Ratzlaff treatment building.  Work is progressing slowly with changes required due to the condition of the existing filter tanks which were unsuitable for re-use and needed replacement.

The first set of filters will be completed in early May with the second set and commissioning of the works scheduled for May-June 2012.

 

Project management services are provided through Genivar (Consulting Engineer) and the CRD (Owner).

 

Please call the following if you have any questions or concerns:

 

Brant Stone 1.250.748.2095 - Reservoir Project

Project Manager, Stone Pacific Contracting Ltd (Prime Contractor)

 

Bill Gardiner 1.250.384.2662 - Water Treatment Project

Project Manager, Pye Construction Ltd (Prime Contractor)

 

Eric Pettit 1.250.384.5510

Project Manager, Genivar (Consulting Engineer)

 

Scott Mason 1.250.474.9665 or Toll Free 1.800.663.4425

Manager, Regional Infrastructure, Infrastructure Engineering, CRD (Owner)